Eurotech an authorized Agent of American Welding Society(AWS). We conduct AWS CWI Examination with documented training in INDIA and MIDDLE EAST. For More Information contact to Mr.Puneet Sharma E-mail: (aws.cwi.training@gmail.com)
Saturday, 30 May 2015
Thursday, 28 May 2015
Monday, 25 May 2015
AWS CWI TRAINING SCHEDULE AHMEDABAD 2015
EUROTECH AWS CWI SCHEDULE AHMEDABAD 2015, INDIA | |||||
SR.NO | SITE CODE | MONTH | SEMINAR DATES | EXAM DATE | CITY |
1 | IN44315 | JULY | 22nd TO 27th JULY | 28th JULY | AHMEDABAD |
2 | IN44815 | SEPTEMBER | 7th TO 12th SEPT | 13th SEPT | AHMEDABAD |
3 | IN45315 | DECEMBER | 4th DEC TO 9th DEC | 10th DEC | AHMEDABAD |
Dear Welding Professionals,
We are delighted to inform you that Eurotech one of the leading welding training providers in India has announce its training schedule of AWS-CWI for Ahmedabad, 2015. We at Eurotech provide 6 days Training and 1 day Exam of AWS-CWI in India.
You can register for the course on Eurotech website
Click Here To Register AWS CWI Certified welding inspector AHMEDABAD JULY 2015
Click Here To Register AWS CWI Certified welding inspector AHMEDABAD SEPT 2015
Click Here To Register AWS CWI Certified welding inspector AHMEDABAD DEC 2015
You can also write or call us to assist on the below email id and contact no.
Puneet Sharma | Call : 08196980555 | E-Mail : aws.cwi.training@gmail.com
Thursday, 21 May 2015
Q:- During root welding, which of the following is true as per lack of root penetration is considered
- The root gap is too large in accordance with WPS
- Preheat was not used
- Current is too low
- Root face is too small
Monday, 18 May 2015
Thursday, 14 May 2015
Q:- In welding procedure transfers joint tensile test the following observation were made. The specimen CSA was recorded as 40mm X 20mm and the max load applied was recorded as ____ . What is the UTS?
237.5KN/mm^2
247.5 N/mm^2
24.5 N/mm^2
237.5 N/mm^2
247.5 N/mm^2
24.5 N/mm^2
237.5 N/mm^2
Tuesday, 12 May 2015
AWS CWI Training Course in Coimbatore
Dear All Welding Engineers we wish to inform you that your Best chance to Become a Certified Welding Inspector (CWI), Eurotech organizing 6 Day AWS CWI Training Seminar In Coimbatore
Location: Coimbatore, India
Start Date: May 25, 2015
End Date: May 31, 2015
Interested Candidates Can Contact Us: Puneet Sharma | Call : 08196980555 | E-Mail : aws.cwi.training@gmail.com
Please promote us,please forward to your friends circles..
Q:- One the advantages of ultrasonic inspection in relation to radiographic testing to
- Access is generally only required from one side (surface)of the component being tested
- The designated work area must be closed off by barriers, therefore safety is increased
- This materials can be easily examined
- A permanent image of the defect can be obtained
Saturday, 9 May 2015
Friday, 8 May 2015
Q:- For the structure termed martensitic to form in a c-mn steel it must first be heated to just below a critical temperature and rapidly cooled
- Just below its lower critical temperature and rapidly cooled
- A maximum temperature of 550*C then rapidly cooled
- Above its upper critical temperature and slowly furnace cooled
- A full transformation to austenite then rapidly cooled
Wednesday, 6 May 2015
Q:- In replacing intermittent fillet weld, BS EN22553 and AWS2.4 differ in?
- The way in which staggering is structure
- The plot distance definition
- Both the above
- None of the above
Tuesday, 5 May 2015
Q:- Why is it essential to clean the surrounding parent metal adjacent to the weld metal made by MMA(SMAW)which is to be ultrasonically tested?
- Sound waves will not travel though paint
- Remove any rust
- The spatter will impede the contact of the probe and the parent material surface
- Spatter will reflect the back will echo signal and give spurious indications
Q:- Clustered porosity found internally in the body other open cf an MMA welding is usually associated with
- Poor inter pass cleaning
- The open circuit current being too high
- Poor stop/start technique or damp electrode coating
- Low open circuit voltage
Monday, 4 May 2015
Q:- You find out that contractor have carried out RT as the 10% contractual percentage required by the specification code. The specification also insists that an additional 2 weld, radiographed for every weld that is failed. One of the pipe's spools had an au acceptable defect which the contractor has ignored and radiographed another weld in its place which is acceptable, what would be your course of action be?
- As long as the other radiograph butt weld is acceptable it's ok, as the 10% condition percentage required by the specification code has been satisfied
- This is usual practice as 10% NDT is really not important
- Review the original failed weld and insist they have the additional 2 welds radiographed
- Review the original have it failed weld and repaired , radiographed , then I would insist that they have an additional 2 weld radiographed
Friday, 1 May 2015
Q:- Some codes require the excess weld metal (weld cap) on cross weld joint tensile specimens to be flush ground, this is because:
- Flushed caps will always break in the weld metal area
- This is to remove any porosity in the excess weld metal (weld cap)
- It is easier to calculate the cross section areas of the joint when fused
- Flushed caps have fuser stress raisers and therefore give a more aqua rate result
Wednesday, 29 April 2015
Q:- With the DPI method of inspection, after the contact time as elapsed the dye should
- Spraying the surface with the remover till all dye as gone then wipe with a clean cloth
- Spraying with developer then wiping with a cloth
- Wipe clean, using lint free cloth soaked in a solvent remover
- It does not matter how it is done as long as all traces of dye are removed.
Tuesday, 28 April 2015
Monday, 27 April 2015
AWS CWI TRAINING SCHEDULE NEW DELHI 2015
EUROTECH AWS CWI SCHEDULE Delhi 2015, INDIA | |||||
SR.NO | SITE CODE | MONTH | SEMINAR DATES | EXAM DATE | CITY |
1 | IN44315 | FEBUARY | 6th TO 11th FEB | 12th FEB | Delhi |
2 | IN44815 | MAY | 9th TO 14th MAY | 15th MAY | Delhi |
3 | IN45315 | AUGUST | 14th TO 19th AUGUST | 20th AUGUST | Delhi |
4 | IN45715 | NOVEMBER | 15th TO 20th JUNE | 9th JULY | Delhi |
Dear Welding Professionals,
We at Eurotech are delighted to inform you that Eurotech has announced its 6 days Training and 1 Day Exam schedule for 2015 New Delhi location. Anyone who want to achieve greater heights in his welding career, then AWS-CWI certification is the ultimate opportunity in achieving those goals.
You can register for the course on Eurotech website
You can also write or call us to assist on the below email id and contact no.
Puneet Sharma | Call : 08196980555 | E-Mail : aws.cwi.training@gmail.com
Sunday, 26 April 2015
Q:- Would you consider using a 5mm electrode for vertical up root runs in a 6G (HL045) fixed position pipe?
- Yes ,it is compatibility
- Yes but this would depend upon the welder skill
- No, it is not the most suitable electrode coating type
- No, the electrode should have been smaller in diameter
Friday, 24 April 2015
Thursday, 23 April 2015
Q:-What is a typical arc voltage setting when welding with the TIG(GTAW) process?
- 18-20v
- 24-26v
- 10-12v
- 70-90v
Wednesday, 22 April 2015
Q:- Asymmetrical weld symbols to EN 22553 are:
- The same side of the arrow
- Different each side of the arrow
- Show fillet weld only
- Show butt weld only
Tuesday, 21 April 2015
Friday, 17 April 2015
AWS CWI Seminar & Exam In Mumbai
AWS Certified Welding Inspector Course in Mumbai |
The American Welding Society CWI Training Seminar and Exam are coming to Mumbai on April 24, 2015 . Provided by Eurotech AWS Agent
This is your chance to take your welding career to the next level.
If you are interested to attend our AWS CWI 6 Day Preparatory Seminar and One day Exam program, you can write or call me to assist you.
Thanks & Regards,
Puneet Sharma
Mobile no. +918196980555
E-mail: aws.cwi.training@gmail.com
Eurotech ACS Pvt. Ltd.
Monday, 13 April 2015
AWS CWI Training Schedule Mumbai 2015
EUROTECH AWS CWI SCHEDULE Mumbai, INDIA | |||||
SR.NO | SITE CODE | MONTH | SEMINAR DATES | EXAM DATE | CITY |
1 | IN44215 | JANUARY | 16th JAN TO 21st JAN | 22nd JAN | Mumbai |
2 | IN44715 | APRIL | 24th TO 29th APRIL | 30th APRIL | Mumbai |
3 | IN45015 | JUNE | 25th TO 30th MAY | 21st JUNE | Mumbai |
4 | IN45115 | JULY | 15th TO 20th JUNE | 9th JULY | Mumbai |
5 | IN45615 | OCTOBER | 12th TO 17th OCT | 18th OCT | Mumbai |
Dear Welding Professionals,
Eurotech India American Welding Society Agent Now Released AWS CWI Certified Welding Inspector Training and certification Preparatory, Seminar & Exam program Schedule in Mumbai, Maharashtra India 2015
Wednesday, 8 April 2015
Basic Metallurgy Courses for Welding & Fabricating Professionals
Eurotech Organizing 2 days "Metallurgy" Course is very beneficial for Welding and Fabrication professionals as it would results in increasing your efficiency. The course objectives are: metals and their properties, to check material test certificate, heat treatment process, Destructive testing, Stainless steel and types, and many more.
It will definitely increase your learning and your work efficiency and boost your career in welding
Please do not hesitate to contact me if you require further information Metallurgy" Course
Best Regards,
Puneet Sharma
Mobile no. 08196980555
Sunday, 5 April 2015
Saturday, 4 April 2015
Q:-Half life is a trem used to describe?
- The penetrating ability of a gamma ray source
- Half the time the gamma source will be use full
- The time taken of the gamma source to reduce the strength by half
- Time of decay of an X ray tube
Thursday, 2 April 2015
Q:- Which one of these test would most probably used for welder qualification on a plate butt weld using 13mm low carbon steel?
- CTOD
- Nick break test
- Fracture fillet test
- IZOD
Monday, 30 March 2015
Q:-If the heat input in the proces is increases then which of following statement is correct ?
- Toughness reduced & hardness increases .
- Toughness increases & hardness reduces .
- Toughness increasing & harness increasing .
- Toughness reduces & hardness reduces .
Thursday, 26 March 2015
Q:- The welder have increased the electrode strike out length of the SAW set, what would be effect on the weld?
- No effect
- Weld width would be narrow
- Penetration will be increased
- The deposition rate will be greater if wire feed rate is increased also
Q: which of the following may increase the risk of haz cracking when welding thick section carbon mangnese steels ?
- slow cooling after welding
- low moisture content in the electrode covering
- use of steel grade with a low cev
- use of a low heat inpu
Tuesday, 24 March 2015
AWS CWI TRAINING SCHEDULE CHENNAI 2015
EUROTECH AWS CWI SCHEDULE CHENNAI, INDIA | |||||
SR.NO | SITE CODE | MONTH | SEMINAR DATES | EXAM DATE | CITY |
1 | IN44415 | FEBRUARY | 21st TO 26th FEB | 27th FEB | CHENNAI |
2 | IN44615 | APRIL | 4th TO 9th APRIL | 10th APRIL | CHENNAI |
3 | IN44915 | MAY | 25th TO 30th MAY | 31st MAY | COIMBATORE |
4 | IN45115 | JULY | 3rd TO 8th JULY | 9th JULY | CHENNAI |
5 | IN45515 | SEPTEMBER | 24th TO 29th SEPT | 30th SEPT | CHENNAI |
6 | IN45915 | DECEMBER | 18th TO 23rd DEC | 24th DEC | CHENNAI |
FOR MORE INFORMATION
YOU CAN CALL OR WRITE US
Thanks & Regards,
For, Eurotech ACS Pvt. Ltd.
Training Manager
Puneet Sharma
M: +91.8196980555
E-mail: aws.cwi.training@gmail.com
Offices : - INDIA,OMAN, KUWAIT UK, US, CANADA, IRELAND
Monday, 23 March 2015
Q:-Asymmetrical weld symbols to EN 22553 are:
- The same side of the arrow
- Different each side of the arrow
- Show fillet weld only
- Show butt weld only
Friday, 20 March 2015
Q:- Solidification cracking occurs:
- In the HAZ
- In the parent metal
- Use low hydrogen electrodes
- All of the above
Wednesday, 18 March 2015
Q:-cathodic cleaning is used to revive ?
- Sign waves
- Oxides
- Surface inclusions
- Low melting point compounds
AWS CWI Training in Chennai
AWS CWI Training in Chennai |
AWS CWI Certified Welding Inspector Courses in Chennai Providing by Eurotech certification AWS India - American Welding Society
Location: Chennai, India
Course Description:
- AWS CWI Official 6 Day Authorised Seminar Chennai Apr 2015
- Welding Inspection Technology Workshop - 3 DAYS
- Visual Inspection Workshop( 1.5 Day)
- API 1104 Code Clinic( 1.5 DAY)
Start Date: April 04, 2015
End Date: April 10, 2015
For More Information About AWS CWI Training, Material, Seminar, and Next Exam Schedule/Price list. you can feel free to Contact Us
Best Regards,
Puneet Sharma
E-mail: aws.cwi.training@gmail.com
M.no 08196980555
Tuesday, 17 March 2015
Q:-In the GTAW process the use of pulsed current helps in a achieving which of the following?
- Electron cleaning effect and penetration
- Controlling heat input and penetration
- Controlling lack of sidewall fusion and heat input
- Controlling spatter and penetration
Monday, 16 March 2015
Friday, 13 March 2015
Q:- A lug weld and a spot weld differ in which h of the following?
- A plug weld has a hole in one member
- A spot weld has a hole in one member
- A spot weld is an arc weld
- A plug weld is a friction weld
Thursday, 12 March 2015
Q:- A Bessemer converter is ?
- Method of producing cost iron
- Method of producing pig iron
- Method of producing wtought iron
- Method of producing stell
Wednesday, 11 March 2015
Tuesday, 10 March 2015
Q:- Many of the meters, instruments & controls on the machine are not welding machine are not working proper their calibration certificate are also out date. What will you do?
- Permit welding to proceed with no further action
- Use a MAP separate measuring instrument and permit welding
- Stop welding until corrective measures are completed to rectify the situation
- Being welding and then report to their management when time is available.
Monday, 9 March 2015
Q: -Which of the following is not considered a type of a metal transfer for GMAW?
- Short circuiting
- Spray
- Globular
- Droplet
- Pulsed arc
Saturday, 7 March 2015
Q:-Low temperature heating giving rise to small readjustment in the position of atoms is know as
- Recrystallsation
- Recovring
- Grain growth
- Aneeling
Wednesday, 4 March 2015
What is difference between post heat and PWHT ?
What is difference between post heat and PWHT ?
Explain with details
Explain with details
- Post heat we use before welding to reduce the cooling rate and Hydrogen level. Nd pwht we use after welding to reduce the residual Stress in weldment
- But before welding we use pre heat my brother did pre and post heat same
- Yes pre and post are same thing
- How come pre and post same meaning . This is wrong my friend pre means before and post means after
- Post heat is ....maintaining homogeneous structure and pwht reduced residual stresses...
- Post heating use for maintain cooling rate of welding and PWHT use for stress refiling
- Post heating will do for avoid h2 (HIC) crack after welding and temperature maintain below 425 C.
- Post heating we do for slow cooling rate to avoid cracking in alloy steel and phwt for stress releavig
- Post heat and post weld heat treatment we use after welding....difference is that in both heat ,
- post heat we use after welding finished in between 10 to 20 mint to reduce the hydrogen level to prevent from crack.... And PWHT we use to reduce residual stresses......
- Also we use different method for both heat to do....
- And temperature is also different....in post heat temperature approximately 120 c and in PWHT Approximately 600 c
- Post heat apply after finish welding before NDT, meanwhile PWHT applied after profile grinding and NDT. No more process applied after PWHT.
- We have to do post heat immediately after welding to slow down cooling rate to prevent cracking and in alloy steel